enTR
enTR

INTEGRATED WORKER ACCOMODATION

INTEGRATED WORKER ACCOMODATION

LOCATION:Umm Slal Ali / Qatar
PROJECT / ALL HIGH AND LOW CURRENT:Work Camps with a capacity of approximately 20,000 people in the important industrial zones of Ras Laffan Industrial City and Masaieed Industrial City.
2B GLOBAL SOLUTIONS:
Designs and applications of all high and low current systems

// PROJE GÖRSELLERİ

Projeye ait diğer görselleri inceleyin!

// DİĞER PROJELER

Farklı Projelerimize Gözatın!
  • ASHGABAT OLYMPIC COMPLEX

    The new Olympic Complex, built on an area of 1,466,400 m2, consists of high-tech facilities.
  • INTEGRATED WORKER ACCOMODATION

    Work Camps with a capacity of approximately 20,000 people in the important industrial zones of Ras Laffan Industrial City and Masaieed Industrial City.
  • BOMONTI I-TOWER

    Built on an area of 80,000 m2.
  • ÖZBEKİSTAN GROSS İNSURANCE

    Content is being prepared...
  • LEH HOSPITAL

    Leh Hospital, a post-civil war healthcare investment in Libya, is seen as an important investment for the region in terms of medical technologies and healthcare quality.
  • GROSS TRADE CENTER

    Gross Trade Center operates as a trade center with a closed area of 18,000 m2 in the city of Tashkent.
  • DÜNYA ŞEHİR MALTEPE

    The project is located in Maltepe Esenkent and construction started in 2023. Consisting of 9 blocks and 781 residences, the project is designed with horizontal architecture and will be realized as one of the largest projects on the Anatolian side....
  • SIEC INTERNATIONAL EQUESTRIAN CENTER

    Built on an area of 22,000 m2.
  • OZYEGIN UNIVERSITY

    Built on an area of 21,000 m2.
  • SOCHI MEDIA CENTER

    The Media Center in the city of Sochi was designed and served as the main information and management center of the Olympic and Paralympic games, allowing over 8,000 mass media representatives to work.
  • DOGUS OTOMOTIV MASLAK

    Built on an area of 25,000 m2.
  • RIXOS BOMONTI

    Built on an area of 35,000 m2.