enTR
enTR

BOMONTI I-TOWER

BOMONTI I-TOWER

LOCATIONIstanbul / Turkey
PROJECT / MEP WORKS Built on an area of 80,000 m2.
2B GLOBAL SOLUTIONS
• High Current and Low Current
• MV, Ventilation and Plumbing
• Fire Fighting Systems and BMS
• Heating and Cooling Systems

// PROJE GÖRSELLERİ

Projeye ait diğer görselleri inceleyin!

// DİĞER PROJELER

Farklı Projelerimize Gözatın!
  • TEKIRA SHOPPING MALL

    As a shopping and living center, Tekira Shopping Center is a center of attraction and attraction for the regional provinces of Tekirdağ, Edirne and the Thrace region in general...
  • RIXOS BOMONTI

    Built on an area of 35,000 m2.
  • ÖZBEKİSTAN GROSS İNSURANCE

    Content is being prepared...
  • PREMIER CAMPUS OFFICE

    Kampüs was built on an area of 120.000 m2 in Kağıthane with the campus office concept, which is the new trend in the world.
  • SOCHI MEDIA CENTER

    The Media Center in the city of Sochi was designed and served as the main information and management center of the Olympic and Paralympic games, allowing over 8,000 mass media representatives to work.
  • LEH HOSPITAL

    Leh Hospital, a post-civil war healthcare investment in Libya, is seen as an important investment for the region in terms of medical technologies and healthcare quality.
  • DÜNYA ŞEHİR KARTAL

    Built on an area of 14,500 square meters and consisting of 360 apartments, World City Kartal is a living center consisting of a 3-storey indoor car park, 2 indoor pools, business lounge, children's playrooms, street shops, large landscaping area and playgrounds.
  • DÜNYA ŞEHİR MALTEPE

    The project is located in Maltepe Esenkent and construction started in 2023. Consisting of 9 blocks and 781 residences, the project is designed with horizontal architecture and will be realized as one of the largest projects on the Anatolian side....
  • BAB PLAZA

    Built on an area of 15,000 m2.
  • ASHGABAT OLYMPIC COMPLEX

    The new Olympic Complex, built on an area of 1,466,400 m2, consists of high-tech facilities.
  • KIZILAY (RED CRESCENT) HOSPITAL

    Built on an area of 9,000 m2.
  • OZYEGIN UNIVERSITY

    Built on an area of 21,000 m2.