en
en

OSMANIYE ALİBEYLİ PROJECT

OSMANİYE ALİBEYLİ PROJECT

LOCATION:Osmaniye / Türkiye
PROJECT / MECHANICAL WORKS:Built on an area of 18,000 m2.
2B GLOBAL SOLUTIONS:
• Planning and architectural design
• Construction permits and licenses
• Construction financing
• FULL MEP & ELV
• Mechanical works
• Electromechanical works
• All high and low current systems

// DİĞER PROJELER

Farklı Projelerimize Gözatın!
  • PREMIER CAMPUS OFFICE

    Kampüs was built on an area of 120.000 m2 in Kağıthane with the campus office concept, which is the new trend in the world.
  • LEH HOSPITAL

    Leh Hospital, a post-civil war healthcare investment in Libya, is seen as an important investment for the region in terms of medical technologies and healthcare quality.
  • KAHRAMANMARAS PROJECT

    A modern residential project is rising in the Çağlayancerit district of Kahramanmaraş, with a total construction area of 21,000 m². Featuring 124 residential units and 6 commercial spaces, the project offers both 2+1 and 3+1 apartment options, providing spacious living areas. Designed to revitalize the region's social and commercial life, this development stands out with […]
  • OSMANIYE ESENEVLER PROJECT

    The Esenevler Project in Osmaniye brings together 45 unique homes. Each residence is meticulously prepared to enhance your quality of life with its functional design and modern architecture. Our project stands out with its spacious interiors, bright rooms, and practical kitchens.
  • DÜNYA ŞEHİR KARTAL

    Built on an area of 14,500 square meters and consisting of 360 apartments, World City Kartal is a living center consisting of a 3-storey indoor car park, 2 indoor pools, business lounge, children's playrooms, street shops, large landscaping area and playgrounds.
  • BAB PLAZA

    Built on an area of 15,000 m2.
  • OSMANIYE ALİBEYLİ PROJECT

    In the heart of Osmaniye, a project is rising over an area of 18,000 square meters. With its modern architecture and extensive amenities, Osmaniye Shopping Mall is poised to become the region's new magnet for shopping and social life. This shopping center, where local and international brands meet, promises to offer visitors a unique shopping […]
  • DOGUS OTOMOTIV MASLAK

    Built on an area of 25,000 m2.
  • SOCHI MEDIA CENTER

    The Media Center in the city of Sochi was designed and served as the main information and management center of the Olympic and Paralympic games, allowing over 8,000 mass media representatives to work.
  • INTEGRATED WORKER ACCOMODATION

    Work Camps with a capacity of approximately 20,000 people in the important industrial zones of Ras Laffan Industrial City and Masaieed Industrial City.
  • RIXOS BOMONTI

    Built on an area of 35,000 m2.
  • BOMONTI I-TOWER

    Built on an area of 80,000 m2.